ROLE & RESPONSIBILITIES
| Position | Estimator | Reports To | CPO |
| Function | Preconstruction / Commercial | Direct Reports | None unless assigned |
| Primary Location | TBD | Travel | See role requirements below |
Compensation Package:
Annual Pay Range (Salary) = Negotiable
Position Summary
Convert drawings, specifications and customer requirements into complete, risk-aware, executable estimates and proposals. Estimators are responsible for protecting margin before the project is sold.
Primary Outcomes
- Estimates reflect realistic labor, equipment, freight, travel, consumables and subcontractor costs.
- Scope boundaries, assumptions and exclusions are clear and aligned with project documents.
- Flush event counts, system volumes, temporary equipment and schedule assumptions are defensible.
- Awarded work transfers cleanly into project budgets and operational plans.
- Historical cost data improves future estimating accuracy.
Key Responsibilities
- Review drawings, specifications, addenda and customer requirements.
- Perform system takeoffs and calculate piping volumes, flow requirements and flushing-event assumptions.
- Develop labor, equipment, filtration, hose/manifold, freight, travel, consumable, rental and subcontractor cost models.
- Solicit and evaluate vendor/subcontractor quotations.
- Coordinate technical assumptions with Engineering and Water Treatment.
- Develop proposal scope, clarifications, exclusions, alternates and commercial risk items.
- Maintain estimate backup and revision history.
- Support customer clarifications, value engineering and scope negotiations.
- Create estimate-to-project budget handoff after award.
- Track estimate versus actual cost and update estimating factors.
Decision Rights & Authority
- Own estimate completeness and document assumptions.
- Escalate projects with incomplete documents, unrealistic schedules, unsafe access or unacceptable risk.
- May recommend price and contingency; final pricing follows approval matrix.
Key Performance Indicators
- Estimate accuracy
- Gross margin at award vs completion
- Proposal turnaround time
- Change-order exposure from scope gaps
- Bid hit rate
- Vendor quote coverage
- Handoff quality
Preferred Qualifications
- Construction estimating, mechanical systems or project engineering experience preferred.
- Ability to read mechanical drawings/specifications and perform quantity/volume calculations.
- Strong spreadsheet, documentation and commercial-detail skills.
First 12-Month Priorities
- Standardize estimate workbook and cost-code structure.
- Build production, rental, freight and consumable cost library.
- Create formal estimate handoff checklist.
Role Expectations
Periodic travel for site walks, customer meetings and project reviews may be required.
